Sunday, March 13, 2011

Masterbasion Female Techn

Brescia Marathon Handbike

1 Bressanello MIRCO 01:21:30
2 CONFORTI CLAUDIO 01:22:28 +57
3 BOSI MASSIMILIANO 1:22:39 +1:09 4
TRIANGEL PIER 1:31:10 +9:40 5
GNAN GIANFRANCO
02:02:46 +41:15 02:06:18 +44:47
STAR Filocamo 6 7 AUGUST PAUL 02:12:33 +51:03
3:01:51 +1:40 8 MAX HAMMER: 20
9 PICCININI ROBERTO 3:14:04 +1:52:34 10
Balduchelli I SERGIO 3:28:45 +2:07:15

Tuesday, February 22, 2011

Briggs And Stratton Governor Springs

History TSN

Highlights additions over the previous version

TSN History

- 1998 start of project feasibility
- the company was founded in June 1999 TSN Ltd, Capital € 10,000, City Sellero 50% + 2 SO
President - May 2001 Regione Lombardia: € 2'410'000 financing, capital of € 550,000, City Sellero 21%, starting with the preliminary contracts
Connection - October 2002 start works, the works are completed in November 2002, the total cost of € 10'300'000
- January 24, 2004 - Inauguration of the virgin biomass CHP plant
- 2004. loss of € 510'999; failure of the turbine for reasons not clearly stated
- 2005. loss of € 304'936;
- 2006. increase share capital by € 1,200,000, City Sellero 11.08%, net of € 8'684 also obtained by spreading more dates for payment of leasing
- 2007 Capital increased to 4'500'000 €, srl spa, City Sellero a mortgage from € 200,000 for capitalization, City Sellero 10:42%, new status and the municipality must give the second
Board - June 26, 2007 President Giampiero Bressanelli submit an application in the province to deal with, in addition to virgin biomass for which the plant was born and funded, "limited to certain types of biodegradable waste, in particular the request includes, inter 'treated wood and other scraps of paper pulper, substances that when burned can cause the emission of dioxins, furans and other toxic and hazardous substances.
- December 2007 the City drops to 5.29% while more than 72% is in the hands of private control
then Artemis - March 18, 2008 after a positive opinion of Municipalities and Communities Montana Saddlery and Paisco Loveno (although they have not received the 'annex on emissions), after seeking an opinion contrary Capodiponte third, while Cedegolo, Berzo Demo Paspardo declare themselves indifferent and accepting the opinion of the Province whose Energy and Environment Office gives the go ahead pending the opinion of the Office Waste.
- June 3, 2008 in the absence of an EIA (environmental impact assessment), noting the danger of what is required for the possible effects on environment and health, the association actively Sellero Novelle matter to the TAR, retreating to the first hearing, the suspension pending the opinion of the Office of Waste Province. The request to the TAR appears to slow the intention of the TSN
- December 2008 energy bills users, closes at a loss to € 1'546'377
- 2009 exchange of chairs: the president Giampiero Bressanelli resigns to stand for election administration. Chairman becomes CEO Guido Ghirardi. After the election, Bressanelli elected as mayor, takes office as president of the outgoing mayor Ezio Laini.
- April 7, 2009 while the country was distracted by the elections, on behalf of Guido Ghirardi TSN starts with the request in the Province per poter bruciare alcune tipologie di rifiuti. Scompaiono dalla richiesta gli scarti di pulper, uno dei materiali più pericolosi fra quelli precedentemente richiesti, ma rimangono i legni trattati (anche con solventi, vernici, sostanze chimiche varie che non possono essere individuate dal solo controllo visivo previsto)
- 9 aprile 2009: arriva l’ok dalla Provincia che autorizza la TSN, che dichiara di non essere assoggettabile alla verifica della VIA
- 2009 si chiude con una perdita di 1'468’600€, le perdite complessive degli ultimi 6 anni ammontano a 4'300’000€. Il capitale sociale passa prima da 4'500’000€ a 798’000€ (con una perdita per il Comune di Sellero di circa 200’000€) and is then completely cleared with loss of 100% of capital invested by individuals and by the municipality (a total of approximately € 238'000). The move effectively excludes the public and the remaining small shareholders through share almost entirely in French hands, via Artemis, bringing the capital to € 450,000. In the presentation of the budget are not provided explanations but you bulldozing evolution for the current year
- inspection of ARPA (minutes of 11.02.2010) and the Provincial Police at Wood Energy, allowed the treatment of certain types of waste and where they are stored in the ashes of TSN: You point out several irregularities in the management of materials, with the presence plastics and more, including organic materials
- 15/11/2010: The Wood Energy Ltd announced the City had sublet the Wood Energy & Environment Ltd on 10/02/2010. The province will declare void the transfer of permits.
- 3/12/2010: Mayor, when asked by the minority, denied being aware of the agreement to sublease Wood Energy & Environment, which is however in agreement protocol town.
- 28/12/2010 deadline imposed by the Court of Breno for the eviction of Wood Energy in question with the City of Sellero for non-payment of rental for over € 400,000 since 2007 when the CEO was the present sindaco. La Legno Energia non lascerà l’immobile in attesa dell’8 febbraio 2011: prevista visita dell’Ufficiale Giudiziario per il rilascio dell’immobile.
- 17/01/2011: la TSN, dopo un incontro col sindaco, invita il Comune ad evitare la completa sospensione delle attività presso i capannoni della Legno Energia.
- 02/02/2011, causa indisponibilità del Giudice, l’udienza per la causa fra il Comune e la Legno Energia è rinviata all’8 giugno.
- 2011 previsti altri 6 milioni di euro di investimento in TSN, sembra per rinnovare l’intero impianto e poter accedere a certificati verdi più cospicui. Nessuna dichiarazione di intenzione da parte della TSN.

Monday, February 21, 2011

Cervical Spondylosisdizziness

39 th Congress of the Nonviolent Radical Party Transnational Transparty

Enea Sansi (Radical historical Valtellina) is inervenuto the 39th Congress of the NRPTT

Monday, February 14, 2011

Ghost Installer Silent Installation Aspupload

M'illumino less

day energy saving initiatives

Program surfed

JOINT Malegno

At the event the City of Malegno promotes initiative M'illumino Less "Program of the day

- 17.00 Hours of opening solar park "Creon"
- 18.30 hours at the board room table discussion on "Park photovoltaics, accounting for CO2, EMAS registration: strategic choices for Malegno"
- 20.00 hours at the ' oratory Tricolore candlelight dinner (reservations at nos 3293448776 and 3472522311)

JOINT CEVO

At event the City of Cevo promotes initiative M'illumino minus

Program of the day - 17.00 presentation of the photovoltaic park Canneto
- 19:00 pm Relay tricolor Canneto - Cevo Admission: Walking through the Alpine Group the country "in the dark."
- 19.30 Torchlight flag, the Cross of the Pope
Concerto In an evocative choreography bands and choirs will perform with Camuni Inno di Mameli final song.
- 20.30 Dinner by candlelight in restaurants and pizzerias.
Romantic and picturesque, entertained by bands and choirs (and info on participating restaurants www.comune.cevo.bs.it

Program of the various local initiatives

TOWN Marone

The City of Marone February 18 will implement the following initiatives:
a) call for all traders to "turn off" the light at its premises from 18.00 to 20.00 utilizando different forms of light (candles, etc.).
b) off the lighting of the town hall square and adjacent
c) lighting of the lake and off the public square by replacing the lights of the battery poles with torches.

JOINT BIENNO

Friday, February 18, 2011, as every year, starting at 19:00 will take the initiative "Via Lucis" religious path of light, prayer and poetry in honor of Saint Gertrude Comensoli, nostra condittadina nel giorno della sua morte.
La manifestazione propone momenti di recitazione, canto e musica con la partecipazione del "Silence Teatro". L'illuminazione pubblica nel Centro Storico del Borgo viene completamente spenta: le vie del borgo saranno straordinariamente illuminate da suggestivi lumi.
Quest'anno, cadendo la ricorrenza nel giorno di M'illumino di meno, piace significare assieme al carattere preminentemente sacro, questa correlazione con la volontà dell'amministrazione di voler agire in favore del risparmio energetico.

Wednesday, February 2, 2011

Sanitaryware Brands In India

History TSN

- 1998 inizio progetto fattibilità
- Giugno 1999 nasce la ditta TSN srl, capitale 10’000€, Comune Sellero 50%, Presidente + 2 CdA
- May 2001 Regione Lombardia: € 2'410'000 financing, capital of € 550,000, City Sellero 21%, starting with the preliminary contracts
Connection - October 2002 start of construction, the works are completed in November 2002, the total cost of € 10'300'000
- January 24, 2004 - Inauguration of the virgin biomass CHP plant
- 2004. loss of € 510'999; failure of the turbine for reasons not clearly stated
- 2005. loss of € 304'936;
- 2006. increase share capital by € 1,200,000, City Sellero 11.08%, net of € 8'684 obtained even more deferring the payment dates of the lease
- 2007 Capital salt to 4'500'000 €, srl spa, City Sellero a mortgage from € 200,000 for capitalization, City Sellero 10:42%, new status and the municipality must give up two
Board - June 26, 2007 President Giampiero Bressanelli submit an application in the province to deal with, in addition to virgin biomass for which the facility was created and funded, "limited to certain types of biodegradable waste, in particular, the application shall include, inter alia, treated wood and waste paper pulper, substances once burnt can cause the emission of dioxins, furans and other toxic and hazardous substances.
- December 2007 the City drops to 5.29% while more than 72% Artemis is in the hands of private control then
- March 18, 2008 after a positive opinion of Municipalities and Communities Montana Saddlery and Paisco Loveno (although they have not received the annex on emissions), after seeking an opinion contrary Capodiponte third, while Cedegolo, Berzo Demo Paspardo declare themselves indifferent and accepting the opinion of the Province whose Energy and Environment Office gives the go ahead pending the opinion of the Office Waste.
- June 3, 2008 in the absence of an EIA (environmental impact assessment), noting the danger of what is required for the possible effects on environment and health, the association has actively Sellero novels appeal to the TAR, retreating at the first hearing the suspension pending the opinion of the Office of Waste Province. The request to the TAR appears to slow the intention of the TSN
- December 2008 energy bills users, closes at a loss to € 1'546'377
- 2009 exchange of chairs: the president Giampiero Bressanelli resigns to stand for election administration. Chairman becomes CEO Guido Ghirardi. After the election, Bressanelli elected as mayor, takes office as president of the outgoing mayor Ezio Laini.
- April 7, 2009 while the country was distracted by the elections, on behalf of Guido Ghirardi TSN starts with the request in the Province in order to burn certain types of waste. Disappear from richiesta gli scarti di pulper, uno dei materiali più pericolosi fra quelli precedentemente richiesti, ma rimangono i legni trattati (anche con solventi, vernici, sostanze chimiche varie che non possono essere individuate dal solo controllo visivo previsto)
- 9 aprile 2009: arriva l’ok dalla Provincia che autorizza la TSN, che dichiara di non essere assoggettabile alla verifica della VIA
- 2009 si chiude con una perdita di 1'468’600€, le perdite complessive degli ultimi 6 anni ammontano a 4'300’000€. Il capitale sociale passa prima da 4'500’000€ a 798’000€ (con una perdita per il Comune di Sellero di circa 200’000€) e viene poi completamente azzerato con loss of 100% of capital invested by individuals and by the municipality (a total of approximately € 238'000). The move effectively excludes the public and the remaining small shareholders through share almost entirely in French hands, via Artemis, bringing the capital to € 450,000. In the presentation of the budget are not provided explanations but you bulldozing evolution for the current year
- inspection of ARPA (minutes of 11.02.2010) and the Provincial Police at Wood Energy, allowed the treatment of certain types of waste and where they are stored in the ashes of TSN: You point out several irregularities in the management of materials, with the presence of plastics and other, including organic materials
- 28/12/2010 deadline imposed by the Court of Breno for the eviction of Wood Energy in question with the City of Sellero for non-payment of rental for over € 400,000 since 2007 when the CEO was the ' current mayor. The Wood Energy will not leave the property in expectation of 8 February 2011: planned visit by the bailiff for the issuance of the building.
- 2011 provided a further 6 million euro investment in NRT, it seems to renew the whole system and have access to the most conspicuous green certificates. No statement of intent by the TSN.

Saturday, January 29, 2011

Pediatrician In Markham Ontario

skulls and skulls





we apologize for the lack of a little 'time to this part, but due to other commitments we have slowed down a bit parallel' the pace of renovation.
we are still working on some pieces for this spring / summer.

in the meantime we suggest skulls, skulls and skulls with some new creations Licia Woods and Sillies!

of course as always purchased through our shop

Monday, January 24, 2011

Avixe Usb Flash Drive

M'illumino less


M'illumino LESS 2011 U.S. clean energy

turn out the lights and turn on the tricolor


http://caterpillar.blog.rai.it/milluminodimeno/




The February 18, 2011 M'illumino back less, the most ever radio campaign on energy saving devised on the globe.

The Energy Saving Day 2011 special edition for the 150th anniversary of the unification of Italy, is scheduled for February 18, 2011. Also this year Caterpillar urges municipalities, associations, schools, businesses and homes all over Italy to join the initiative by creating that "energy silence" which involved the streets across Europe in recent years to make room, where possible, to ignition virtuous, based on renewable sources.

For February 18 we, together with the symbolic shutdowns, switching lights clean original themed flag. Turbine, lanterns, LED or bicycles, tri-color lights that feed throughout the country. We learn to save, to produce clean energy and demand better for everyone.

At the present stage of technological research is already possible to produce energy with the sun, the wind, the sea, the warmth of the land or biomass. Appealing to the inexhaustible ingenuity Italic invitiamo tutti, dagli studenti ai precari, dalle aziende in crisi alle amministrazioni comunali, a misurarsi con la green economy adottando un sistema pulito per spegnere lo spreco e accendere una scenografia tricolore il 18 febbraio 2010. Segnalateci la vostra intenzione di ideare dei M’illumino Mob, eventi che riuniscano più persone, privilegiando luoghi aperti e pubblici, particolarmente visibili, ricreando una sorta di Spedizione dei Mille M’illumino nelle piazze spente di tutt’Italia, per testimoniare la necessità di una gestione più “illuminata” del nostro futuro.

La campagna 2011 inizierà il 24 gennaio, raccontando per radio le buone pratiche di produzione e di consumo intelligente di energia, and giving voice to the most interesting accessions for February 18.

also abroad we will experience for the rationalization of consumption and government virtuous from the standpoint of sustainable management of energy resources.

www.caterpillar.rai.it on, you can signal their membership and find all the materials to advertise the initiative in the workplace, at school or in your town.

Wednesday, January 19, 2011

Should Men Shave Underarms 2010

Meetup Vallecamonica

is born Meetup Vallecamonica:


and now it comes to the thorny issue biomass Sellero .

A good example is the Wood Energy would have to leave the property for rent by 28/12/2010. The next hearing on the dispute with the City on 2 February at the Court of Breno. The TSN was founded with funding from public and now private, but has not yet clarified how it intends to resolve its heavy financial and in particular what is the end of the next investment of € 6 million.

Monday, January 17, 2011

Mt. Pinatubo Inolonggapo

Biomass: dossier from the west

Biomass: a brief dossier on the new big buffalo from
www.savonaeponente.com

of VALERIA ROSSI - In Italy, you know, even excellent ideas are likely to become a boomerang.
let alone only "good", which from the outset have limitations and require very specific care.

The biomass power stations, as well as have been conceived and designed, was not a bad idea for small plants to burn the waste products of local sawmills, with the use of a short chain, would allow power generation and district heating a low environmental impact and cost. And in fact this happens in Germany, Finland and other countries which have put a biomass also because they have large forests and timber virtually unlimited. In Italy this condition does not exist in fact. Deforestation has already been far too kind in regions with high ratio of cement (such as Liguria, of course), so that the majority of disasters as "natural" actually have very little natural: it is the lack of plants and allow roots to landslides, floods, and sometimes tragedies for a few drops of water.
Unfortunately, Italy does not seem to ever be able to face new challenges - but only the new projects - on two criteria: a) common sense (or rather, let's also a sense of proportion), b) the consideration that any new draft should be addressed taking into account the very first thing of interest citizens, the good of the community and not the interests of the individual.
This, mind you, does NOT mean that "no one should make money" not to vivamo Puffolandia. But it means that you can earn the "right", the lawful, without overwhelming any other, and without jeopardizing public safety.
This, in Italy, no longer the case: and the reasons are many, difficult to simplify ... but some just jump in the eyes.
obvious, for example, that the municipalities are all in the throat with water. Why? Because the elimination of ICI before, and so-called "stability pact", then, have in fact and preventing unsustainable cuts imposed on local governments to carry out their tasks effectively.
Conspicuous for that Italian society (and not "the world": the phenomenon is widespread, but here is much worse than average) has now taken the same result of his government: that is, aim at the welfare of the few not only ignoring that of many, but trampling each time this may conflict with the private sector. We live in a world no longer based on solidarity and common good (civic values, but also Christian values), but on your death, vita mea.
is why, in Italy and particularly in our region, from an idea - albeit with some reserve - is acceptable, such as plant biomass, we moved to a business to run rampant, out of control and above all in the running to ruin.
Ruin but before being declared such, is likely to go through a monstrous waste of public resources, and - unfortunately - even through the aggravation of an already unsustainable pollution .............. ....................

read more about
http://www.savonaeponente.com/2011/01/17/biomasse-breve-dossier-sulla-nuova-grande-bufala-2/