History TSN
- 1998 inizio progetto fattibilità
- Giugno 1999 nasce la ditta TSN srl, capitale 10’000€, Comune Sellero 50%, Presidente + 2 CdA
- May 2001 Regione Lombardia: € 2'410'000 financing, capital of € 550,000, City Sellero 21%, starting with the preliminary contracts
Connection - October 2002 start of construction, the works are completed in November 2002, the total cost of € 10'300'000
- January 24, 2004 - Inauguration of the virgin biomass CHP plant
- 2004. loss of € 510'999; failure of the turbine for reasons not clearly stated
- 2005. loss of € 304'936;
- 2006. increase share capital by € 1,200,000, City Sellero 11.08%, net of € 8'684 obtained even more deferring the payment dates of the lease
- 2007 Capital salt to 4'500'000 €, srl spa, City Sellero a mortgage from € 200,000 for capitalization, City Sellero 10:42%, new status and the municipality must give up two
Board - June 26, 2007 President Giampiero Bressanelli submit an application in the province to deal with, in addition to virgin biomass for which the facility was created and funded, "limited to certain types of biodegradable waste, in particular, the application shall include, inter alia, treated wood and waste paper pulper, substances once burnt can cause the emission of dioxins, furans and other toxic and hazardous substances.
- December 2007 the City drops to 5.29% while more than 72% Artemis is in the hands of private control then
- March 18, 2008 after a positive opinion of Municipalities and Communities Montana Saddlery and Paisco Loveno (although they have not received the annex on emissions), after seeking an opinion contrary Capodiponte third, while Cedegolo, Berzo Demo Paspardo declare themselves indifferent and accepting the opinion of the Province whose Energy and Environment Office gives the go ahead pending the opinion of the Office Waste.
- June 3, 2008 in the absence of an EIA (environmental impact assessment), noting the danger of what is required for the possible effects on environment and health, the association has actively Sellero novels appeal to the TAR, retreating at the first hearing the suspension pending the opinion of the Office of Waste Province. The request to the TAR appears to slow the intention of the TSN
- December 2008 energy bills users, closes at a loss to € 1'546'377
- 2009 exchange of chairs: the president Giampiero Bressanelli resigns to stand for election administration. Chairman becomes CEO Guido Ghirardi. After the election, Bressanelli elected as mayor, takes office as president of the outgoing mayor Ezio Laini.
- April 7, 2009 while the country was distracted by the elections, on behalf of Guido Ghirardi TSN starts with the request in the Province in order to burn certain types of waste. Disappear from richiesta gli scarti di pulper, uno dei materiali più pericolosi fra quelli precedentemente richiesti, ma rimangono i legni trattati (anche con solventi, vernici, sostanze chimiche varie che non possono essere individuate dal solo controllo visivo previsto)
- 9 aprile 2009: arriva l’ok dalla Provincia che autorizza la TSN, che dichiara di non essere assoggettabile alla verifica della VIA
- 2009 si chiude con una perdita di 1'468’600€, le perdite complessive degli ultimi 6 anni ammontano a 4'300’000€. Il capitale sociale passa prima da 4'500’000€ a 798’000€ (con una perdita per il Comune di Sellero di circa 200’000€) e viene poi completamente azzerato con loss of 100% of capital invested by individuals and by the municipality (a total of approximately € 238'000). The move effectively excludes the public and the remaining small shareholders through share almost entirely in French hands, via Artemis, bringing the capital to € 450,000. In the presentation of the budget are not provided explanations but you bulldozing evolution for the current year
- inspection of ARPA (minutes of 11.02.2010) and the Provincial Police at Wood Energy, allowed the treatment of certain types of waste and where they are stored in the ashes of TSN: You point out several irregularities in the management of materials, with the presence of plastics and other, including organic materials
- 28/12/2010 deadline imposed by the Court of Breno for the eviction of Wood Energy in question with the City of Sellero for non-payment of rental for over € 400,000 since 2007 when the CEO was the ' current mayor. The Wood Energy will not leave the property in expectation of 8 February 2011: planned visit by the bailiff for the issuance of the building.
- 2011 provided a further 6 million euro investment in NRT, it seems to renew the whole system and have access to the most conspicuous green certificates. No statement of intent by the TSN.
0 comments:
Post a Comment